So-Called Kaizen: The Excuse Of The Lazy To Progress.
As an engineer
who used to work at a manufacturing plant (and who is also very cynical), A Kaizen can be quite crap ice cream with a shit cherry.
For those
imaginary readers of this blog who are not familiar with this term: A Kaizen is a Japanese philosophy
project of continuous improvement (too bad they are not implementing
it in their security standards at nuclear plants, sea life, gender rights, gender identity and sexual
preferences philosophies). This general idea sounds very good on
theory: “Everything can be improved, EVERYTHING”.
This is very
optimistic, but it carries one inherent problem: Everything has its
limits, at least from within the plant, economic security or even
technological limits. But we will talk about these sandwich-ruining
turds in another post and today we’ll focus on “Mandatory
Kaizen”, thinking that forcing an engineer to be creative and
accomplish a quota of implemented Kaizen with the stress of already
being pre-occupied with their daily tasks (you know: THEIR JOB) can
result the next big thing in manufacturing innovation and add some
pennies on the ashtray of those executive’s second extramarital
lovers’ Range Rover Evokes.
I understand that
everything can be improved, but many may not be either as smart or
have a “safe enough” idea to implement that they can propose
without being rejected. So the mentality of an engineering ex-student
is simple: Take a garbage idea outside your normal activities and call it
innovative.
I was once on a
group to diagnose an issue of one product and I focused on the theory
of how it worked and how to test it, this was because I had the
mental skills to study (which the other apparently didn’t), but not
the skills to move people to run experiments.
At the end of the week we found the cause, which was a design
error. The product was not designed by our plant, so we reported
back to our customer (in this case, the customer was also de
designer). My team suddenly, with a stupid smug grin said:
-
Hey, are you ready for the picture?
-
What picture?
-
The one of the team for the Kaizen! We will present it to compete for the best Kaizen of the month!
-
What Kaizen?
-
For the one you did the investigation.
-
That was not a Kaizen.
-
Yes, it was!
-
No, a Kaizen is an improvement of OUR process. Not for a problem that came from outside. It was a failure analysis report.
-
We improved the situation.
-
No. We provided feedback to the customer, it was the least we could do. That is not an improvement.
So to avoid the second hand humiliation of seeing their “Kaizen” being rejected I left the
team… Aaaaaand with shame I regret to inform you that apparently the
plant managers have swapped their brains for Hello Kitty stickers and
fleshlights, because the Kaizen won.
So, I can see the
next article I will publish for “Manufacturing for Tossers”
magazine:
“AMAZING NEW
MANUFACTURING IMPROVEMENT: NOTIFYING THE DESIGNER WHEN THEIR DESIGN
IS WRONG.”
Then I’ll maybe
drink some thermal paste and fuck my brain out of existence.
The problem does
not originate with them (although, they are still bashed with the
guilty hammer so hard their brain is dropping through the eyes),
because when you force your employees for generate ideas instead of
encouraging them (which is very different) you will obtain shit. And
the low quality shit that will not pass as chocolate, no matter what
shape you give it.



Comments
Post a Comment