So-Called Kaizen: The Excuse Of The Lazy To Progress.

As an engineer who used to work at a manufacturing plant (and who is also very cynical), A Kaizen can be quite crap ice cream with a shit cherry.
For those imaginary readers of this blog who are not familiar with this term: A Kaizen is a Japanese philosophy project of continuous improvement (too bad they are not implementing it in their security standards at nuclear plants, sea life, gender rights, gender identity and sexual preferences philosophies). This general idea sounds very good on theory: “Everything can be improved, EVERYTHING”.
This is very optimistic, but it carries one inherent problem: Everything has its limits, at least from within the plant, economic security or even technological limits. But we will talk about these sandwich-ruining turds in another post and today we’ll focus on “Mandatory Kaizen”, thinking that forcing an engineer to be creative and accomplish a quota of implemented Kaizen with the stress of already being pre-occupied with their daily tasks (you know: THEIR JOB) can result the next big thing in manufacturing innovation and add some pennies on the ashtray of those executive’s second extramarital lovers’ Range Rover Evokes.
I understand that everything can be improved, but many may not be either as smart or have a “safe enough” idea to implement that they can propose without being rejected. So the mentality of an engineering ex-student is simple: Take a garbage idea outside your normal activities and call it innovative.
I was once on a group to diagnose an issue of one product and I focused on the theory of how it worked and how to test it, this was because I had the mental skills to study (which the other apparently didn’t), but not the skills to move people to run experiments.
At the end of the week we found the cause, which was a design error. The product was not designed by our plant, so we reported back to our customer (in this case, the customer was also de designer). My team suddenly, with a stupid smug grin said:
  • Hey, are you ready for the picture?
  • What picture?
  • The one of the team for the Kaizen! We will present it to compete for the best Kaizen of the month!
  • What Kaizen?
  • For the one you did the investigation.
  • That was not a Kaizen.
  • Yes, it was!
  • No, a Kaizen is an improvement of OUR process. Not for a problem that came from outside. It was a failure analysis report.
  • We improved the situation.
  • No. We provided feedback to the customer, it was the least we could do. That is not an improvement.
  • Whatever…
So to avoid the second hand humiliation of seeing their “Kaizen” being rejected I left the team… Aaaaaand with shame I regret to inform you that apparently the plant managers have swapped their brains for Hello Kitty stickers and fleshlights, because the Kaizen won.
So, I can see the next article I will publish for “Manufacturing for Tossers” magazine:
“AMAZING NEW MANUFACTURING IMPROVEMENT: NOTIFYING THE DESIGNER WHEN THEIR DESIGN IS WRONG.”
Then I’ll maybe drink some thermal paste and fuck my brain out of existence.
The problem does not originate with them (although, they are still bashed with the guilty hammer so hard their brain is dropping through the eyes), because when you force your employees for generate ideas instead of encouraging them (which is very different) you will obtain shit. And the low quality shit that will not pass as chocolate, no matter what shape you give it.

Comments

Popular posts from this blog

APA reference format can go to hell for all I care.

Statistics: A good weapon used badly... by tossers

Engineering Changes: A Way To Screw Your Job